STATE KEY LABORATORY OF DIGITAL STEEL

【Performance evaluation】Constant Temperature and Humidity Testing Machine

 

Constant Temperature and Humidity Testing Machine

 

Name: Constant Temperature and Humidity Testing Machine

Manufacturer: Japan Tabai ESPEC Corporation

Purchasing date: September, 2007

Equipment model: PR-2KT

 

Main Specifications:

1. Temperature range and amplitude of accommodation: -20 ~ 100 ℃ ± 0.3 ℃

2. Humidity range adjustment range: 20 ~ 98% RH ± 2.5% RH

3. Temperature rising time: 20 ~ -10 ℃ within 35 minutes

4. Temperature falling time: 20 ~ -10 ℃ within 25 minutes

5. Function: anti- corrosion test through temperature and humidity changes

 

The main application areas: test various types of materials for their tolerances of heat, cold, dry and humidity.

                                          

Main functions: Through simulating the status of the product under hot and humid environment, test whether its adaptability and properties change or not, and test its reliability and temperature and humidity environment.

Person in charge of the equipment: Xue Wenying

Location: Room 137,RAL

Ways of contact:

 Tel: 83686420

E-mail:

 

Technology (Safety) Rules

  1. Switch on main power supply on the right side of the device.
  2. Put the samples on the tray, and then put them into chamber. Pay attention to leave room between samples to prevent the interaction between samples.
  3. Check the water storage tank below the machine. Fill the tank with deionized water if there is water shortage. Then push it back.
  4. Tap POWER button on the control panel to start the constant temperature and humidity testing machine. When POWER indicator and displayed digits stabilized, the experiment begins.
  5. Press the RESET button to enter program settings. Enter the temperature adjustment interface. Press ENT to save the settings after the temperature was adjusted to the experimental temperature.
  6. Press NEXT to convert interface.
  7. Enter the humidity control interface. Press ENT to save the settings after the humidity was adjusted to the experimental humidity.
  8. After checking the experimental procedure accurately, press OPER. / STOP button to start the experiment.
  9. Press KEYLOCK to lock the operator panel to prevent accidentally hitting the button, which disrupt the operating procedures.
  10. After the experiment, empty the water tank to prevent scale deposit from clogging the pipeline for a long time without using.
  11. Switch off the power supply on the side of the machine. The experiment ends.

 

Attention: Be careful to open or close the chamber door, and avoid getting a burn. Non-operating personnel cannot open the side wall of the chamber nor freely change its internal circuitry.